NYSE: SLI   $3.68 USD   +0.24 (+6.52%) TSXV: SLI   $5.16 CAD   +0.23 (+4.46%)
Technology
Demonstration Plant

Demonstration Plant

Standard Lithium’s large scale Demonstration Plant, located at the LANXESS South Plant near El Dorado, Arkansas, processes Smackover brine through the first commercial scale DLE column installed anywhere in North America. The Demonstration Plant is highly automated and is operated by a dedicated and knowledgeable team of Engineers, Chemists, and Operations staff.

In collaboration with joint development partner Aquatech (successor to  Koch Technology Solutions or KTS), the Demonstration Plant has been invaluable in successfully proving the DLE technology at scale. Over 35 million gallons of brine have been processed through the facility since 2020, with over 12,000 DLE cycles executed using the Li-ProTM Lithium Selective Sorption (LSS) commercial scale unit supplied by KTS (now Aquatech).

In addition to our Demonstration Plant, Smackover Lithium successfully completed the de-risking of its DLE technology with a field-test at its South West Arkansas Project. A field-pilot DLE facility was built and ran nearly 500 DLE cycles, processing 2,385 barrels of brine sourced from SWA Project well. The field-pilot facility exceeded key performance criteria. It recovered over 99% of lithium from brine and rejection of key contaminants were all within acceptable tolerance of design criteria. Approximately 970 gallons of concentrated and purified lithium chloride solution (6% LiCl solution) was produced. This field test is viewed as final testing of the flowsheet and the results underpin the SWA Project’s FEED and DFS.

Standard Lithium’s Demonstration Plant

Standard Lithium’s Demonstration Plant

Field-pilot DLE facility at South West Arkansas Project

Field-pilot DLE facility at South West Arkansas Project

Latest News

Nov 18, 2025
Standard Lithium to Participate in Multiple Upcoming Investor Conferences
Standard Lithium to Participate in Multiple Upcoming Investor Conferences Preview Image
Read more
Nov 10, 2025
Standard Lithium Reports Third Quarter 2025 Results
Standard Lithium Reports Third Quarter 2025 Results Preview Image
Read more
Nov 5, 2025
Smackover Lithium Files Maiden Inferred Resource for Its Franklin Project in East Texas, Containi...
Smackover Lithium Files Maiden Inferred Resource for Its Franklin Project in East Texas, Containing the Highest Reported Lithium-in-Brine Grades in North America Preview Image
Read more
Oct 30, 2025
Smackover Lithium Receives Key Final Integration Approval from the Arkansas Oil and Gas Commissio...
Smackover Lithium Receives Key Final Integration Approval from the Arkansas Oil and Gas Commission for South West Arkansas Project Preview Image
Read more

Subscribe to our News

Sign Up Image